The Apache Software Foundation
The Apache Software Foundation Incubator

ZEPPELIN Project Incubation Status

This page tracks the project status, incubator-wise. For more general project status, look on the project website.

Description

ZEPPELIN is a collaborative data analytics and visualization tool for distributed, general-purpose data processing systems such as Apache Spark, Apache Flink, etc.

The Zeppelin project graduated on 2016-05-18

News

  • 2016-03-29 New committer: Prabhjyot Singh.
  • 2016-01-16 New committer: Felix Cheung.
  • 2015-11-18 Zeppelin 0.5.5-incubating released.
  • 2015-10-03 New committer: Jongyoul Lee.
  • 2015-07-23 Zeppelin 0.5.0-incubating released.
  • 2015-06-24 New committer: Mina Lee.
  • 2014-12-23 Project enters incubation.

Project info

item type reference
Website www http://zeppelin.incubator.apache.org/
. wiki https://cwiki.apache.org/confluence/display/ZEPPELIN
Mailing list users users@zeppelin.incubator.apache.org
. dev dev@zeppelin.incubator.apache.org
. commits commits@zeppelin.incubator.apache.org
. private private@zeppelin.incubator.apache.org
Bug tracking JIRA https://issues.apache.org/jira/browse/ZEPPELIN
Source code Project GIT https://git-wip-us.apache.org/repos/asf/incubator-zeppelin.git
. GitHub mirror http://github.com/apache/incubator-zeppelin
Champion . .
. rvs Roman Shaposhnik
Mentors . .
. cos Konstantin Boudnik
. hyunsik Hyunsik Choi
. tdunning Ted Dunning
. hsaputra Henry Saputra
. rvs Roman Shaposhnik
Committers . .
. moon Lee Moon Soo
. anthonycorbacho Anthony Corbacho
. corneadoug Damien Corneau
. bzz Alexander Bezzubov
. kevinkim Kevin Sangwoo Kim
. minalee Mina Lee
. jongyoul Jongyoul Lee
. felixcheung Felix Cheung
. prabhjyotsingh Prabhjyot Singh

Incubation status reports

Incubation work items

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).

Identify the project to be incubated

date item
2015-01-03 Make sure that the requested project name does not already exist. Please follow the guide to ensure a suitable project/product name. Tracking via PODLINGNAMESEARCH-64

Infrastructure

date item
2015-01-03 Ask infrastructure to create source repository modules and grant the committers karma. Tracking via INFRA-8968
2015-01-03 Ask infrastructure to set up and archive mailing lists.
2015-01-03 Ask infrastructure to set up issue tracker (JIRA).
2015-01-03 Ask infrastructure to set up wiki (Confluence).
2015-01-03 Ask infrastructure to set up svn pubsub website.
2015-03-25 Migrate the project to our infrastructure.

Mentor-related responsibility/oversight

date item
2015-01-03 Subscribe all Mentors on the pmc and general lists.
date item
2015-03-20 Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project.
2015-11-14 Check and make sure that the files that have been donated have been updated to reflect the new ASF copyright.

Verify distribution rights

date item
2015-11-11 Check and make sure that for all code included with the distribution that is not under the Apache license, we have the right to combine with Apache-licensed code and redistribute.
2015-11-11 Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms.

Establish a list of active committers

date item
2015-01-03 Check that all active committers have submitted a contributors agreement.

Project specific

Add project specific tasks here.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project?
  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.)
  • Are project decisions being made in public by the committers?
  • Are the decision-making guidelines published and agreed to by all of the committers?

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers?

Project Specific

Add project specific tasks here.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • If graduating to an existing PMC, has the PMC voted to accept it?
  • If graduating to a new PMC, has the board voted to accept it?

Incubator sign-off

  • Has the Incubator decided that the project has accomplished all of the above tasks?